|
|
Markus Fugmann: 03.12.08 12:07 Update Wochenausblick... |
|
|
WOI Wochenübersicht: 03.12.08 11:35 WOI Weekly - Berg -und... |
|
|
Norbert Lohrke: 03.12.08 08:36 Merger Telekom und Arcandor |
| Thema eröffnet von: | Wallstreetoffline | Beiträge: | 25 | Bewertung (2): | |
|
| am: | 06.03.08 22:17 | Gelesen gesamt: | 432 | |||
| Letzter Beitrag von: | Illuminati | Gelesen heute: | 2 | |||
| am: | 07.11.08 19:14 |
|
|
Von Wallstreetoffline | Erstellt am: 06.03.08 22:17 | Beitrag Nr.: 125.470 | Weitere Beiträge |
| Diesen Beitrag: | ||||
Nacel Energy Capital Structure
State of Incorporation
Wyoming
Date of Incorporation
Feb, 2006
Maximum Number of Shares Authorized
50,000,000
Total Number of Shares Currently Issued (fully diluted)
21,400,000
Total Number of Shares Held by Management (restricted)11,000,000Shares
Publicly Traded
10,400,000
INVESTOR PACKET
http://www.nacelenergy.com/shareholders/request.html
Report über Nacel
http://www.alphatrade.com/news/stories/AM/2008-03-06/MRW/200803060300MRKTWIREUSPR____0371291.html
|
|
Von Wallstreetoffline | Erstellt am: 06.03.08 22:19 | Beitrag Nr.: 125.471 | Weitere Beiträge |
| Diesen Beitrag: | ||||
Brian Lavery – CEO, President
Over a career spanning two decades, Mr. Lavery’s primary role has been to manage large-scale industrial projects, within budget and on-schedule, for America’s largest construction & contract engineering firms, including most recently Fluor Corporation of Irving, TX. Mr. Lavery brings a wealth of experience in capital project estimating, cost-accounting and scheduling to his position as President of Nacel Energy. The long list of renewable and conventional power generation projects to which Mr. Lavery has contributed his expertise includes; the 950MW Burrard generating station; the 215MW Meridian co-generation plant; the 3.8 MW Mears Creek "run of river" hydro project; and one of the largest turbine refits ever undertaken in North America -- at the 2730MW GM Shrum generating station. Mr. Lavery, 46, earned his card in the International Association of Machinists (IAMAW) in 1984 and a Master’s Degree in Business Administration (MBA) in 2001.
Operations
Under the direction of President, Brian Lavery, the 3 person Nacel Energy Operations team assists at various stages of project development – including due diligence regarding site evaluation and selection; wind resource analysis; soil analysis (for foundation design); local permitting requirements; facility electrical load studies; construction management (including wind turbine selection and procurement; utility interconnection design and approvals, foundation, tower, and wind turbine construction and erection; component testing and wind system startup and commissioning) wind and wind turbine power measurements and data logging; and long term wind turbine operation and maintenance.
Ben Lowther - Mechanical Operations
Mr. Lowther is a Professional Mechanical Engineer (P.Eng) with 40 years experience. Mr. Lowther has completed major energy and power generation project assignments for corporations such as Fluor Corporation, Detroit Edison and Bechtel Power Corp. Mr. Lowther’s responsibilities for Nacel Energy include defining and validating mechanical engineering and related criteria and assumptions during all wind energy project stages - from feasibility through commissioning.
Roger Hoad - Electrical Operations
Mr. Hoad is an Industrial Electrical Superintendent with 40 years experience. Mr. Hoad has completed major renewable energy power generation project assignments for corporations such as Duke Energy, Calpine and Mitsui. Mr. Hoad’s responsibilities for Nacel Energy include monitoring wind energy project construction activities to ensure quality, schedule adherence and compliance with drawings, specifications and codes through regular inspections.
Marcel Bittel - Program Development
Mr. Bittel is a Professional Engineer (P.Eng) with a Masters Degree in Business Administration (MBA). Mr. Bittel is responsible for ensuring the Company’s wind power generation development activities meet business objectives. Mr. Bittel’s work includes implementing capital management and progress tracking systems and guiding each Nacel Energy project through feasibility, definition, permitting, design, contracting, construction and start-up – all within the regulatory approval process. Mr. Bittel has 20 years of industrial, multi-discipline, project management and development experience and has completed major assignments for a long list of clients including, BHP Billiton, Freeport McMoran, & Caterpillar.
IPOdesktop (ID) SAFE HARBOR STATEMENT: Statements contained in this document, including those pertaining to estimates and related plans, potential mergers and acquisitions, estimates, growth, establishing new markets, expansion into new markets and related plans other than statements of historical fact, are forward-looking statements subject to a number of uncertainties that could cause actual results to differ materially from statements made. ID provides no assurance as to the subject company's plans or ability to effect any planned and/or proposed actions. ID has no first-hand knowledge of management and therefore cannot comment on its capabilities, intent, resources, nor experience and makes no attempt to do so. Statistical information, dollar amounts, and market size data was provided by the subject company or its agent and related sources believed by ID to be reliable, but ID provides no assurance, and none is given, as to the accuracy and completeness of this information.
|
|
Von Wallstreetoffline | Erstellt am: 06.03.08 22:24 | Beitrag Nr.: 125.472 | Weitere Beiträge |
| Diesen Beitrag: | ||||
Compare & Contrast
GROWTH PLAN
Address: 301 Thelma Drive Suite 501 Casper WY 82609
Telephone: 307-461-4221
CEO: Brian M. Lavery
Web Site: http://www.nacelenergy.com/
State or other jurisdiction of incorporation or organization: Wyoming
Transfer Agent: Island Stock Transfer
Investor contact: Murray Fleming, 1-888-242-5848, info@nacelenergy.com
http://www.gaskinsco.com/linkto-ncen.shtml
|
|
Von Wallstreetoffline | Erstellt am: 06.03.08 22:31 | Beitrag Nr.: 125.473 | Weitere Beiträge |
| Diesen Beitrag: | ||||
Performance ZeitraumPerformanceØ Volumen pro Tag
1 Woche+6,29%106.530
4 Wochen+87,88%88.164
52 Wochenn.a.59.832
Datum Eröffnung Hoch Tief Schluss Umsatz (in Stück) Umsatz(inUSD) Preisfeststellungen
29.02.2008 1,80 1,84 1,52 1,63 502.841 663.141,00 372 22.02.2008 1,64 2,00 1,64 1,83 90.966 154.840,00 123
01.02.2008 0,98 0,99 0,97 0,99 128.770 59.960,00 40
23.01.2008 0,95 1,01 0,95 0,98 137.248 95.234,00 33
15.01.2008 1,00 1,00 0,92 0,98 124.248 120.656,00 61
11.01.2008 0,95 1,01 0,79 1,01 86.141 78.345,00 82
14.12.2007 1,00 1,03 0,97 1,03 18.100 11.731,00 25
Performance ZeitraumPerformanceØ Volumen pro Tag
1 Wochen.a.3.333
4 Wochenn.a.3.333
52 Wochenn.a.3.333
|
|
Von Wallstreetoffline | Erstellt am: 06.03.08 22:32 | Beitrag Nr.: 125.474 | Weitere Beiträge |
| Diesen Beitrag: | ||||
|
|
Von Wallstreetoffline | Erstellt am: 09.03.08 21:51 | Beitrag Nr.: 125.739 | Weitere Beiträge |
| Diesen Beitrag: | ||||
langsam scheint ncen zu überzeugen
|
|
Von Entsafter | Erstellt am: 18.03.08 11:08 | Beitrag Nr.: 126.645 | Weitere Beiträge |
| Diesen Beitrag: | ||||
|
|
Von ZockerGerhard | Erstellt am: 19.03.08 22:42 | Beitrag Nr.: 126.969 | Weitere Beiträge |
| Diesen Beitrag: | ||||
IRW-PRESS: NACEL Energy Corp.: Nacel Energy erweitert die Kapazität des wichtigsten Windenergiekorridors des Landes um 20 MW
Nacel Energy erweitert die Kapazität des wichtigsten Windenergiekorridors des Landes um 20 MW
CASPER, WY Mittwoch, 19. März 2008 NACEL Energy Corporation (News) (OTC BB NCEN) (FRANKFURT: 4FC) (NACEL Energy), ein Entwickler einer Windenergieinfrastruktur zur Erzeugung von sauberer, erneuerbarer Energie für Amerika, meldete heute, dass das Unternehmen das 20-Megawatt-Windenergieprojekt Blue Creek, nördlich von Amarillo, TX, erschließen wird. Der Westen von Texas gilt als einer der besten Windenergiekorridore der Vereinigten Staaten. Abgesehen von NACEL Energy besitzen auch Shell, BP und Florida Power & Light aktive Windenergieprojekte in dieser Region.
Brian Lavery, President von NACEL Energy, sagte:
Das Projekt Blue Creek steigert die aktuellen Betriebe von NACEL Energy und bringt uns näher an das Ziel des Unternehmens heran, innerhalb von 36 Monaten 80 Megawatt an neuer Stromerzeugungskapazität zu entwickeln und dabei den Wert für das Unternehmen und für die Aktionäre zu erhöhen.
Im Rahmen ihres letzten Updates meldete die American Wind Energy Association (AWEA), dass Texas im Kampf um den besten US-Bundesstaat für Windenergie, gemessen an der installierten Kapazität, seinen Vorsprung gegenüber Kalifornien halten konnte. Die texanischen Windparks erzeugen nun insgesamt über 4.356 Megawatt Energie, genug für 1,5 Millionen Haushalte (AWEA, American Wind Energy Association Market Report, Januar 2008).
Über NACEL Energy Corporation
NACEL Energy Corporation ist ein schnell wachsendes Windenergieerzeugungsunterne hmen, das saubere und erneuerbare Energie für Amerika erzeugt. NACEL Energy zählt bei der Erzeugung von COMMUNITY WIND vorteilhafte Windenergieerzeugungspro jekte mit nachhaltiger Wirkung von 20 MW und mit der Teilnahme von örtlichen Partnern zu den führenden Unternehmen des Landes. Angesichts seiner wachsenden Pipeline von neuen Windenergieprojekten ist das Unternehmen auf gutem Wege, bis 2010 80 MW Strom für 25.000 amerikanische Haushalte zu liefern. NACEL Energy wurde im Jahr 2006 gegründet; der Firmensitz befindet sich in Casper, Wyoming.
Weitere Informationen erhalten Sie auf unserer Website: www.nacelenergy.com
NACEL Energy The WIND POWER COMPANY TM
|
|
Von ZockerGerhard | Erstellt am: 26.03.08 17:21 | Beitrag Nr.: 127.470 | Weitere Beiträge |
| Diesen Beitrag: | ||||



|
|
Von Stargold123 | Erstellt am: 28.03.08 10:45 | Beitrag Nr.: 127.713 | Weitere Beiträge |
| Diesen Beitrag: | ||||
meine Meinung, aus meiner Sicht, so wie ich das sehe ;-)